Hardware Commissioning has started in the tunnel - some 600 m is cold
Power converter tests underway
Field control room - 100 m. underground
Heading down the the straight section towards LHCb
Survey marks on the tunnel floor - TCDI are the transfer line collimators
Junction of TI8 and the LHC - note the QRL going up to make way for injection line magnets